FCDL Comment: |
MR1:The funding request Line 001 unit cost was modified from $4,634.20 to $3,083.10 in order to remove the License charge of $1,149.00 and the Power Supply charge of $402.10. Line 008 was added for the License charge and Line 009 for the Power Supply charge. Modified Line 003 from $2,517.00 to $2,116.00 in order to remove the Secondary Power Supply charge of $363.80, the Type 1 Stacking Cable charge of $19.10 and the Catalyst Stack Power Cable charge of $18.10. Line 010 was added for the Secondary Power Supply charge, Line 011 for Type 1 Stacking Cable charge and Line 012 were added for the Catalyst Stack Power Cable charge. |